
Lagos-Calabar highway lacks master design — Umahi
The Minister of Works, David Umahi, stated that the 750-kilometre Lagos-Calabar Coastal Highway, started in March 2024, has no single comprehensive engineering design after more than two years. Instead, the project is designed and costed section by section based on varying terrain, with no complete master design, subsoil investigation or full technical documents found in ministry archives.
Pidgin: Minister of Works, David Umahi, talk say di 750-kilometre Lagos-Calabar Coastal Highway wey dem start for March 2024, no get one complete engineering design after more dan two years. Instead, dem dey design and cost am section by section based on different terrain, and no complete master design, subsoil investigation or full technical documents dem find for ministry archives.
How this affects you: No direct impact stated in source.
Join the debate
No comments yet. Be the first.
Debate with other Nigerians: WhatsApp channel · @ST_Office2027 on X