STST Office
Infrastructure · Punch ·

Lagos-Calabar highway lacks master design — Umahi

The Minister of Works, David Umahi, stated that the 750-kilometre Lagos-Calabar Coastal Highway, started in March 2024, has no single comprehensive engineering design after more than two years. Instead, the project is designed and costed section by section based on varying terrain, with no complete master design, subsoil investigation or full technical documents found in ministry archives.

Pidgin: Minister of Works, David Umahi, talk say di 750-kilometre Lagos-Calabar Coastal Highway wey dem start for March 2024, no get one complete engineering design after more dan two years. Instead, dem dey design and cost am section by section based on different terrain, and no complete master design, subsoil investigation or full technical documents dem find for ministry archives.

How this affects you: No direct impact stated in source.

Join the debate

    No comments yet. Be the first.

    Debate with other Nigerians: WhatsApp channel · @ST_Office2027 on X

    Follow ST OfficeFree daily updates on WhatsApp and Facebook, morning and midday.

    Want us in your Google results? Add ST Office as a preferred source.

    Add ST Office as a preferred source on Google

    More from ST Office

    Read today's full edition →

    Sponsors

    Your logo hereYour logo hereYour logo hereYour logo hereYour logo hereYour logo here
    Become a sponsor