
Sanwo-Olu: Opebi-Mende bridge 80% complete, opens before Christmas
Lagos Governor Babajide Sanwo-Olu says the Opebi-Mende Link Bridge is 80 percent complete and will open to the public before Christmas. The project features over 300 tonnes of steel installed at heights up to 25 metres, with a design reflecting the area's cane-weaving history, and includes LED lights in Lagos colours.
Pidgin: Lagos Governor Babajide Sanwo-Olu talk say Opebi-Mende Link Bridge don reach 80 percent complete and dem go open am for public before Christmas. Di project get over 300 tonnes of steel wey dem go install for height wey reach 25 metres, with design wey reflect di area cane-weaving history, plus LED lights for Lagos colours.
How this affects you: Motorists in Ikeja and environs will benefit from reduced gridlock around the Opebi/Mobolaji Bank Anthony Way/Ojota/Mende corridor.
Join the debate
No comments yet. Be the first.